Projects
Six projects, each with its result.
Storage, grid and wind work from 2016 to today. Pick a field or read them all.

Tidemark Energy
·
2025
·
Storage
Ostrand 200
A 200 MW, 400 MWh battery beside a retired coal plant.
Energised
11 days early

Voltaic North
·
2023
·
Storage
The commissioning playbook
One test sequence for every site, written with the technicians who use it.
14 weeks down to
8.7 weeks

Norrvind Offshore
·
2016
·
Wind
Havbrise array cables
Test programme for a 54-turbine offshore wind farm.
48 km
tested, no rework.

Kestrel Grid Services
·
2018
·
Grid
Kestrel substation retrofits
New protection relays at 14 live substations on a regional network.
14 substations,
no unplanned outage

Halberg Storage
·
2020
·
Storage
Sol y Viento hybrid plant
A 110 MWh battery added to a working solar farm in southern Spain.
Curtailed solar cut by
61%

Voltaic North
·
2022
·
Grid
Grid-forming pilot
First grid-forming inverter trial on a 40 MW battery site.
Held frequency through
12 fault tests